image missing
Date: 2025-08-24 Page is: DBtxt003.php txt00029027
US RAIL
US FREIGHT RAIL INFRASTRUCTURE

Distant Signal: How CSX Built a 35 mile Double Track Main Line Using Only 1500 Feet of New Track


Original article: https://www.youtube.com/watch?v=4zZQtX6sh20
How CSX Built a 35 mile Double Track Main Line Using Only 1500 Feet of New Track Distant Signal Apr 21, 2023 160K subscribers ... 402,900 views ... 20K likes How CSX created a double track Main out of their Rice Yard at Waycross by utilizing an old, underused subdivision. I tracked the project from Waycross over to Nahunta and back. Transcript Follow along using the transcript. Show transcript Distant Signal 160K subscr
Peter Burgess COMMENTARY



Peter Burgess


SITE COUNT Amazing and shiny stats
Copyright © 2005-2021 Peter Burgess. All rights reserved. This material may only be used for limited low profit purposes: e.g. socio-enviro-economic performance analysis, education and training.