![]() Date: 2025-08-22 Page is: DBtxt003.php txt00004298 | |||||||||
Management | |||||||||
Burgess COMMENTARY | |||||||||
This first image shows the core relationships between activities, data, analysis and feedback. These are the basis for everything.
This shows the elements in a bit more detail
The image shows how, over time, the effort may be reduced while the benefit stays for the long haul. Any initiative that does not have this characteristic should be considered as something of a failure, and the performance metrics should show this. ![]() |