Energy Efficiency in Buildings

Some of the initiatives being promoted in the Commonwealth of Pensyulvania

Burgess COMMENTARY

Peter Burgess

Open pdf ... EnergyRetrofitIndustry ... Rockefeller Foundation and DB Climate Change Advisors http://www.dbcca.com/dbcca/EN/_media/Building_Retrofit_Paper.pdf


Open pdf ... EnergyMarket_PhiladelphiaRetrofits2011 ... Greater Philadelphia Innovation Cluster (GPIC) by Econsult Corporation
Open pdf ... KeystoneHelpEnergyEfficiencyElements ... Elements of the Keystone program


ENERGY STAR

All improvement work (including additional non-qualifying items) can be financed if at least 75% of the project consists of qualifying improvements and all related installation work as listed below.

  • •AIR SOURCE HEAT PUMP (SPLIT SYSTEMS)
  • •AIR SOURCE HEAT PUMP (PACKAGE SYSTEMS)
  • •CENTRAL AC SYSTEM SPLIT SYSTEMS
  • •CENTRAL AC PACKAGE SYSTEMS
  • •BOILERS (ALL FUELS)
  • •FURNACES (NATURAL GAS, OIL OR PROPANE) Effective 2/1/12 ENERGY STAR minimum natural gas is 95% AFUE
  • •FURNACES (OIL)
  • •INDOOR SOLID FUEL BURNING FURNACES (wood, coal etc.) ENERGY STAR rating not required AFUE ≥ 78% or OMNI rated
  • •WATER HEATERS (ALL FUELS)
  • •CEILING FANS
  • •PROGRAMMABLE THERMOSTATS
  • •VENTILATING FANS
  • •WINDOWS/DOORS With NFRC label, U factor .30 or less
  • •AIR SEALING AND INSULATION
ENERGY STAR certification not required. All of the following must be achieved:
  • •Air sealing of the home and ducts (non-blower door), and
  • •Ceiling insulation installed achieves R-38 or better*, and
  • •Floor insulation installed achieves R-25 or better*
* *Unless structural limitations prevent achievement of these insulation levels, in which instances the maximum R-value that can be achieved is required, with complete fill of ceiling and floor cavities with insulation (i.e. no voids) at a minimum.
ADVANCED PERFORMANCE

All improvement work (including additional non-qualifying items) can be financed if at least 75% of the project consists of qualifying improvements and all related installation work as listed below.

  • • AIR SOURCE HEAT PUMP (SPLIT SYSTEMS) ... SEER ≥ 15.0, EER ≥ 2.5, HSPF ≥ 8.5
  • • AIR SOURCE HEAT PUMP (PACKAGE SYSTEMS) ... SEER ≥ 14.0, EER ≥ 2.0, HSPF ≥ 8.0
  • • CENTRAL AC SYSTEMS ... SEER ≥ 16.0, EER ≥ 13.0
  • • CENTRAL AC PACKAGE SYSTEMS ... SEER ≥ 14.0, EER ≥ 12.0
  • • BOILERS (NATURAL GAS, OIL OR PROPANE) ... AFUE ≥ 90
  • • FURNACES (PROPANE) ... AFUE ≥ 95
  • • FURNACES (OIL) ... AFUE ≥ 90
  • • WATER HEATER (GAS, OIL OR PROPANE): ... Energy Factor ≥ 0.82 OR thermal efficiency ≥ 90%
  • • WATER HEATER (ELECTRIC HEAT PUMP): ... Energy Factor ≥ 2.0
  • • R – 5 WINDOWS OR LOW-E STORM WINDOWS
  • • AIR SEALING AND INSULATION
ENERGY STAR certification not required All of the following must be achieved:
  • • Blower door-directed air sealing of the home and ducts is performed, in accordance with ENERGYSTAR recommended air sealing practices, BPI Technical Standards for Envelope or BPI Technical Standards for Building Analyst, and
  • •Ceiling insulation installed achieves R-38 or better*
  • •Floor insulation installed achieves R-25 or better*
  • •Wall insulation installed achieves R-15 or better.*
* Unless structural limitations prevent achievement of these insulation levels, in which instances the maximum R-value that can be achieved is required, with complete fill of ceiling and floor cavities with insulation (i.e. no voids) at a minimum. Source: Payback source DBCCA and Transcend Equity analysis, 2011. EIA and DOE Building Data Book, 2010, DBCCA Analysis 2011. Paybacks are pre subsidy and reflect a simple return of capital invested without additional return. Payback periods are estimates and there are no assurances that stated payback periods will be achieved
SITE COUNT Amazing and shiny stats
Copyright © 2005-2021 Peter Burgess. All rights reserved. This material may only be used for limited low profit purposes: e.g. socio-enviro-economic performance analysis, education and training.